top of page

Progress Update on the 2x4 N Scale Layout



I’ve made progress on the 2x4 N Scale Layout project and have worked on partially building 13 additional structures for the layout. It is faster to build all the structures at once than one at a time, and I needed to get the basic walls put together so I would be able to figure out all the structure footprints and thus where roads and other scenery items were to be placed. This also allowed me to redesign the layout of the top level so it was more interesting.


You can watch the full video below.



275 views4 comments

Recent Posts

See All

Running Trains One Last Time

A collection of the final video and photos I took of the 2’x4’ N scale layout before packing it up in a shipping crate and sending it off across the country. See how I did that in my Tuesday, June 11t

Operating Session on the 2’x4’ N Scale Layout

A look at an operating session with a switch list on the 2’x4’ N Scale project layout. This was a simple operating session that only took about 10 minutes, although it would have taken longer if I was

4 comentários


rjcsue
rjcsue
07 de ago. de 2023

There should be two Tuesdays in each week. Sadly, there is not!

Curtir
Stephen Strum
Stephen Strum
15 de ago. de 2023
Respondendo a

But I do have a Short on YT every Friday morning at 6 CT. I'll eventually be putting out the Shorts more than once per week, probably at least twice per week, maybe 3x per week for a while later this year. I can't seem to get ahead on the Tuesday videos, however, so those will remain once per week for a while. I want to get enough done to have 2 per week during December if I can, but we will see. December is far and away the biggest month of the year for ad revenue and November is close behind, so that is the time to maximize the number of posts if I can.

Curtir

rjcsue
rjcsue
01 de ago. de 2023

Worth the wait, exciting and clever oh, how I wish there was more!

Curtir
Stephen Strum
Stephen Strum
15 de ago. de 2023
Respondendo a

Thanks!

Curtir
bottom of page