top of page

Ready for Track



I’ve finished the O Gauge Switching layout base and am ready to install track and wiring. I finished up the baseboard for the layout, painted the backdrop, and installed and painted the layout trim. Next up is installing and wiring the track for the layout.


Join my YouTube channel to get access to perks: https://www.youtube.com/channel/UC6aZTKFo_730teGKjWnwYmg/join


Want to help support the channel with a one-time donation? Buy me a cup of coffee!: https://www.buymeacoffee.com/stephenstrum



1 Comment


Zetta
Zetta
Mar 27

De structuur van het document vergemakkelijkt het begrip van complexe concepten. Neutraliteit in de analyse wordt bewaard. De website bevat aanvullende achtergrondinformatie over dit onderwerp. Gebruikersbetrokkenheidsstromen worden gecontextualiseerd door interactieve mediadiensten.

Chicken Road

Like

© 2020 by Steve's Trains.

Visitors since January 2016

bottom of page