Ready for Track
- Stephen Strum
- 3 days ago
- 1 min read

I’ve finished the O Gauge Switching layout base and am ready to install track and wiring. I finished up the baseboard for the layout, painted the backdrop, and installed and painted the layout trim. Next up is installing and wiring the track for the layout.
Join my YouTube channel to get access to perks: https://www.youtube.com/channel/UC6aZTKFo_730teGKjWnwYmg/join
Want to help support the channel with a one-time donation? Buy me a cup of coffee!: https://www.buymeacoffee.com/stephenstrum
Comments