top of page

First Run of Four Trains at Once on the 2x4 N Scale Layout


I finally have all the track installed on the 2x4 foot N scale project layout and the wiring complete enough to run four trains at one time on the layout. I have the middle switching area hooked up to my NCE Powercab, while the other three track loops are currently connected to some battery powered Rokuhan packs. I'm still waiting for additional wiring supplies to arrive in the mail, so I can't yet complete the wiring on this layout.


You can watch the first run of all four trains below. I'll have the video and blog post out on the track installation and initial wiring in a couple of weeks.


Want to help support the channel? Buy me a cup of coffee! https://www.buymeacoffee.com/stephenstrum



284 views1 comment

Recent Posts

See All
bottom of page